Can this be done, or is it a known limitation ?

Basically, I want the subtasks to stay hidden / collapsed under their master task by default, unless they meed the row filtering criteria.

I.e. if I have

Master due in 3 weeks
A no due date
B due the day after tomorrow
C no due date

I want to only see Master (A, B, C collapsed) when I open the task view sorted by Priority, but I want B shown under it's day header when I resort by due date (with A and C remaining collapsed under Master task).

Instead, no matter what I do, I either see all of them expanded by default, or all hidden by default. I can only achieve the view I want by manually collapsing Master. Seems since this can be done manually, this should be possible to do by default ?

Am I doing something wrong, or is it a limitation ?


This message was edited Jun 28, 2017.
Jake

Toodledo Founder
Posted: Jun 28, 2017
Score: 0 Reference
Right now, you can only have the subtasks either hidden or showing. It isn't possible to have them showing only if certain criteria are met.